Here is the shower before:
...and after day one:
This one is looking at the ceiling, which was taken out to install a vent.
We are going to do either carrara or white porcelain subway tiles on the shower walls with black and white hexagonal tiles on the floor. And a light, barely there mint green paint (at left) on the bathroom walls:
So much progress in one day! Very exciting.
No comments:
Post a Comment